Current work
Six countries. One model.
Each project is shown with its stage, its counterparties and AMPM Futures’ exact role, set out plainly. US$137m+ in structured development.
How to read this page: projects reach bankability in stages, from Concept to Feasibility to Structuring to Financing. Every card shows where a project genuinely stands. All investment and employment figures are design targets or projections, stated per stage.
Across Africa
One model,
applied across six countries.
Each flagship project is a node in the same system, the Integrated Production Hub Model. It is designed to be repeated, connecting local resources to global markets.
Flagship project portfolio
Terebinte Integrated Agriculture Project
Poultry, aquaculture and agri-tunnel farming feeding an integrated processing hub. The model’s flagship demonstration node, with a pilot targeted for 2026.
- US$60m Phase 1 investment potential
- 1,000–1,500 permanent jobs targeted
- 15,000t p.a. processing capacity · US$15m p.a. export target
- Phase 2: 3 hubs · US$150m · 2,000–3,000 further jobs by 2029
Fishery & Agri-Tunnel Sustainable Development Project
Tuna extraction, aquaculture and tunnel farming, integrated with processing and export. The national PPP design where the IPHM was first developed.
- US$62m Phase 1 investment potential
- 2,000–2,500 permanent jobs targeted
- ~US$58m p.a. export revenue potential
- Phase 2: value chains across 3 islands · US$150m
Brukarros Beef & Lamb Value Chain Venture
Revitalising an established, EU-approved multi-species abattoir into a fully integrated, operationally controlled livestock value chain.
- US$15.4m (NAD 295m) investment requirement
- Committed offtake from GPS Food Group (EU & Norway markets)
- FSSC 22000-certified · EU-export-approved facility
- Existing infrastructure, requiring recapitalisation rather than invention
Mini-Hydro Renewable Energy Programme
A portfolio of mini-hydro schemes (1.5–5 MW each) beginning with the Mfu pilot in the Sanaga River Basin. Rural electrification at bankable scale.
- 29 MW+ immediate pipeline potential
- Signed MOU with the Government of Cameroon (Mfu pilot)
- MOU-based pathway, rather than competitive tenders
Terebinte South Africa
Terebinte project development with South African partners. Scope and sites are being defined alongside the Zambian flagship.
AMPM Futures: lead developer & concept owner Angola · Integrated agriculture Under assessmentTerebinte Angola
Assessed for a Terebinte integrated production hub on the Zambia model. Engagement and scoping under way.
AMPM Futures: originatorNext step
Look closer.
Allocating capital? Request the project briefings. Holding an opportunity that belongs on this page? Tell us about it.
Direct line: info@ampmfutures.com. Detailed project documentation is available under NDA.